When the bed level of the canal is higher than the highest flood level (H.F.L) of the drainage :

When the bed level of the canal is higher than the highest flood level (H.F.L) of the drainage, then the cross drainage work is said to be
(a) canal syphon
(b) syphon aqueduct.
(c) aqueduct
(d) super-passage

Anurag Mishra Professor Asked on 31st December 2015 in Physics.
Add Comment
1 Answer(s)

Answer: (a) canal syphon

Anurag Mishra Professor Answered on 3rd January 2016.