To complete the work in stipulated time the number of extra labours required is:

A contractor was engaged to construct a road in 16 days. After working for 12 days with 20 labours it was found that only 5/8th of the road had been constructed. To complete the work in stipulated time the number of extra labours required is:

  1. 16
  2. 10
  3. 12
  4. 18
Anurag Mishra Professor Asked on 10th December 2015 in Maths.
Add Comment
1 Answer(s)

Answer:  (1) 16 