How many Days are Needed to Complete the Work?

12 men can do a piece of work in 24 days, How many days are needed to complete the work if 8 men do this work?

  1. 28
  2. 36
  3. 48
  4. 52
Harsh Vardhan Professor Asked on 29th July 2015 in Maths.
Add Comment
  • 1 Answer(s)

    Answer: (2) 36 days
    Explanation:-
    12 men can do a piece of work  = 24 days
    12 men can do work in a day = 1/24
    1 men can do work in a day = /12 x 24

    Then, 8 men can do the same work in a day = 8/12 x 24
    = 1/36
    Therefore, 8 men can do the same work = 36 days
    Hence, the answer is (2) 36 days.

    Anurag Mishra Professor Answered on 29th July 2015.