Which of the following is the most correct estimate?

(a) detailed estimate
(b) building cost index estimate
(c) plinth area estimate
(d) cube rate estimate

Anurag Mishra Professor Asked on 31st December 2015 in Physics.
Add Comment
1 Answer(s)

Answer: (a) detailed estimate 

Anurag Mishra Professor Answered on 3rd January 2016.