A can do a piece of work in 60 days and B alone can do it in 50 days. A works for 12 days and leaves. How long will be take to complete the remaining works?

  1. 35
  2. 40
  3. 30
  4. 25
Monis Rasool Professor Asked on 30th June 2015 in Reasoning Questions.
Add Comment
  • 1 Answer(s)

    Answer: (2) 40
    Explanation:-
    A can do a piece of work = 60 days.
    A can do work in a day = 1/60
    A can do work in 12 days = 12/60
    = 1/5
    Remaining work = 1 – 1/5 = 4/5

    B can do the same  work = 50 days.
    B can do the remaining work = 4 x 50/5 = 40 days.
    The answer is (2) 40.